Commission the rig · Lesson 12 of 15
Check the new assemblies before stepping
With the mast supported in the yard, reconcile each tagged assembly with its location and approved specification. Ask the rigger to verify terminal seating, pin retention, spreader tips and furler configuration while these points are accessible. Photograph each completed mast-level connection.
Workshop assignment
Build a sign-off list running from masthead to heel. Record any discrepancy as open until the responsible person resolves it.
Check your understanding
Why photograph the spreader connections before stepping?
Compare your reasoning
The images document assembly and give later inspections a baseline for hard-to-see areas.
Rigging references · Seldén Mast manuals · Sta-Lok terminal instructions