← Replacing Sailboat Lifelines syllabus

Install and commission · Lesson 7 of 10

Remove and route one run

Plan the work with the boat secured and the affected side closed to traffic. Provide separate fall protection where exposure requires it and keep the boat out of service while the rail is open. Tag the old parts before removal. Follow the recorded route through smooth guides, keeping unfinished ends clean and checking clearances at shrouds and gate posts.

Upper and lower runs interrupted by a boarding gate
Upper and lower runs interrupted by a boarding gate

Workshop assignment

Use a checklist at each post. Verify the right hole, a clear lead and a smooth bearing surface before fitting the last terminal.

Check your understanding

Should the remaining lower lifeline serve as a tether anchor while the top line is out?

Compare your reasoning

Use an independently approved attachment and a suitable work plan. A perimeter lifeline is not a jackline anchor by default.

Product reference · Johnson Marine lifeline fitting and installation instructions