← Sailing Academy

Replacing Sailboat Lifelines

Trace each span from pulpit to stern rail, prepare a measurement sheet for the rigger and check the finished installation. Work through 10 free lessons or go directly to your boat’s next project.

Start the course →
Upper and lower runs interrupted by a boarding gate

Survey the existing rail

  1. 1. Map the lifeline runs
  2. 2. Inspect stanchions and deck attachments
  3. 3. Read wear at contact points

Specify the replacement

  1. 4. Choose wire or synthetic lifelines
  2. 5. Measure each finished assembly
  3. 6. Select terminals and plan fabrication

Install and commission

  1. 7. Remove and route one run
  2. 8. Fit and check the boarding gate
  3. 9. Adjust and secure the system
  4. 10. Commission and inspect after use