Run a loaded tender acceptance check
Choose sheltered water, good visibility and an appropriately equipped crew wearing flotation. Make the first trip short enough to return promptly if a fitting shifts or cooling changes.
1. Run a repeatable circuit
Check steering and shutdown controls, then test low-speed maneuvering and return to idle. Increase load on the motor progressively within the boat and engine limits. Record loading, trim position, cooling indications and any vibration. Stop for leaks, alarms or unstable handling.
2. Inspect at the dock
Shut down, secure the boat and inspect the clamp position, fuel connections and transom. Note any change from the installation photographs. Record unresolved findings and correct them before a longer trip with passengers.
Workshop question
Why include a second dockside inspection after a successful run?
Check your answer
Some movement, rubbing and seepage first appear under thrust and remain visible after the motor stops.
Example engine reference · Honda BF4A, BF5D and BF6A owner’s manual. Match the published procedure to your own model and serial range.