← Standing Rigging syllabus

Read the rig · Lesson 1 of 15

Trace the load path

Start on the dock with an end-on photograph. Follow one cap shroud from its attachment high on the mast, across the spreader tip and down to the chainplate. Then follow the chainplate below deck to the structure that takes its load. A stainless fitting disappearing through the deck is only the visible middle of this path.

Cap shroudSpreader
End view of a single-spreader rig. Follow each cap shroud from masthead to deck.

Workshop assignment

Sketch both sides. Circle each connection you could identify and leave a gap wherever trim or structure hides the next connection.

Check your understanding

Why can a tidy deck fitting conceal an important defect?

Compare your reasoning

The attachment and surrounding structure below deck carry load and can deteriorate out of sight.

Rigging references · Seldén Mast manuals · Sta-Lok terminal instructions