← Replacing Running Rigging syllabus

Replace halyards and sheets · Lesson 5 of 14

Replace an internal halyard

Lower and secure the sail. Independently support anything the halyard holds. Label both ends and confirm which way the finished end must travel. Use the mast maker’s messenger attachment method. Keep both ends controlled while one person feeds and another pulls gently by hand. Exchange one line at a time.

Sail headSheaveTo cockpit
Example main halyard. Follow the colored line from the sail head over the masthead sheave and back to deck.

Workshop assignment

Practice the messenger connection on a spare block. Mark the chosen exit and secure the messenger before disconnecting the old halyard.

Check your understanding

The joint stops halfway. Should you use a winch?

Compare your reasoning

Stop pulling. Ease back by hand if it moves freely and investigate the joint and route. Seek mast access through a rigger if the path is lost.

Rigging references · Seldén running rigging guidance · Samson rope care and splicing resources