← Replacing Running Rigging syllabus

Replace halyards and sheets · Lesson 7 of 14

Reeve a mainsheet tackle

Support and restrain the boom independently before unloading the tackle. Locate the becket, identify each sheave and photograph the final lead. Match the reeving to the exact block arrangement. Run the tackle through its working travel by hand and watch for twists or rubbing between spans.

Fixed endTailMoving block
Two supporting spans grow as the moving block travels. Each metre of separation takes two metres of line.

Workshop assignment

Number the sheaves on a photograph and trace the route from dead end to tail. Check travel with the boom in its furthest intended position.

Check your understanding

Why can a correctly centered boom hide a short mainsheet?

Compare your reasoning

Much more rope is consumed between the blocks as the boom moves out.

Rigging references · Seldén running rigging guidance · Samson rope care and splicing resources