Quality and handover · Lesson 25 of 25
Capstone: price and schedule a haul-out repaint
Build a job packet for a fictional fiberglass cruiser needing topside touch-ups, renewed cockpit traction and fresh bottom paint. Give each zone its own substrate record, compatible coating stack, measurement, labor estimate, environmental limits and inspection points. List unresolved assumptions before committing to a launch date.

Plan preparation, coats and cure in sequence
Workshop assignment
Produce a marked-up hull sketch, a materials worksheet and a calendar with an alternate weather day. Have a partner introduce a surprise: the old bottom paint is unidentified or rain interrupts the final primer coat. Revise the job and identify who must approve the change.
Practice paint estimate
Check your understanding
What shows the project is ready to schedule?
Compare your reasoning
Every zone has a documented compatible system and safe access, the crew can meet the application and cure requirements, and the yard has agreed on waste control, support moves and launch timing.
Technical references · Interlux product-system guides · International dew-point guidance · Aluminum antifouling compatibility