Repair planning and finishing · Lesson 21 of 22

Inspect and document the finished repair

Record the original finding, who determined the scope, the approved materials, batch information, environmental observations and photographs at each stage. Finishing paint can conceal edges that were visible during assembly. Agree on inspection points before work begins.

Before cover-up · Finished surface (schematic)

Workshop exercise

Create a sample handover packet for a locker-lid coupon. Include before and after photographs, a labeled sketch, cure record and any deviations. For a real structural repair, include the qualified repairer’s verification and follow-up requirements.

Custom boat construction
Custom boat construction · Boatyard context

Check your understanding

Which photograph is especially hard to recreate after finishing?

Show the reasoning

The exposed substrate and reinforcement layout before they were covered.

Further reading · WEST SYSTEM Fiberglass Boat Repair & Maintenance manual