← Fiberglass course syllabus

Repair planning and finishing · Lesson 18 of 22

Cored hardware penetrations and backing

A deck fitting introduces both a water path and a concentrated load. A seal at the top, a core-isolation detail and a load-distributing backing arrangement perform different jobs. Obtain the approved construction detail before removing a loaded fitting or changing hole geometry.

Bolt · Core · Backing plate (schematic)

Workshop exercise

Draw a section through a hypothetical bolt and label the head, outer skin, core, inner skin and backing. Use one arrow for a possible leak and another for load. Compare your drawing with the builder’s detail for the boat.

Surveying a boat
Surveying a boat · Boatyard context

Check your understanding

Will new bedding alone repair already crushed or detached core?

Show the reasoning

No. The core condition and attachment load path require their own assessment.

Further reading · WEST SYSTEM Fiberglass Boat Repair & Maintenance manual